COMMUNICATION EQUIPMENT PACKAGE FOR JHARKAND AND WBSETCL REGION
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of various elements of digital telecommunication system which includes SDH equipments, EDFA, power supply system, Test Equipments and accessories.
Status :
Delivery Completed. Site Implementation under progress.Top
TELECOM SYSTEM FOR 220/66KV AND 66/11KV AT VARIOUS SUBSTATIONS IN JAMMU & KASHMIR
Customer :
KEC International Limited
Scope:
Turnkey scope of project involves supply, installation, testing and commissioning of SDH STM-4 System, PDH System and Test Equipment connectivity from 220/66 KV Alusten (Srinagar), Drass, Kargil, Khalsti, and Leh substation for 220/66 KV.
Status :
Delivery Completed. Site Implementation under progress.Top
TELECOM SYSTEM FOR LAMAHI–GHORAHI TRANSMISSION LINE
Customer :
Nepal Electricity Authority
Scope:
Scope of project includes supply of dedicated 100 Mbit/s PDH optical fiber based telecommunication system, primary order multiplexer (2 Mbit/s), voice and data interface units which will be utilized to provide voice and data communication facilities between Lamahi – Ghorahi Substations.
Status :
Delivery Completed. Site Implementation under progress.Top
TELECOM SYSTEMS PROJECT FOR NEW MARSYANGDI 132 KV SUB-STATION
Customer :
Pinggao Group Co. Ltd. Enduser: Nepal Electricity Authority
Scope:
The various elements of the digital transmission system design offered are 8 Mbit/s Optical Line Terminal Equipment, 8 Mbit/s Second Order Multiplexer, 8 Mbit/s Change-Over Unit, 2 Mbit/s Primary Order Multiplexer, Voice and Data Interface Units, Tele- Protection Equipment, Telecom Equipment Cabinet, Optical fiber cable, Fiber Optic Patch Panel, Intermediate Distribution Frame. The dedicated 8 Mbit/s PDH optical fiber based telecommunication system will provide the voice and data to address the information needs of SCADA application, electrical network operations, customer services, and management processes.
Status :
Delivery completed. Awaiting site readiness.Top
TELECOM SYSTEMS PROJECT FOR VARIOUS SUB-STATIONS IN BGCL - PACKAGE 4
Customer :
Siemens Ltd.Enduser: Bihar Grid Corporation Limited
Scope:
The turnkey scope entails supply, installation and commissioning of the following systems that form the entire communication equipment package: SDH equipment (STM 4) with optical line interfaces and tributary cards, Drop-insert multiplexers, Network Management System, EPABX System, 4 Port VoIP Gateway, MDF and DDF cross connects and equipment cabinets.
Status :
Delivery completed. Awaiting site readiness.Top
TELECOMMUNICATION SYSTEMS FOR 132 KV LINE FROM DAMAK TO KABELI
Customer :
Jaguar Overseas Ltd.Enduser: Nepal Electricity Authority
Scope:
Turnkey scope of the project involves design, supply, delivery, installation, field testing and commissioning of optical line terminal equipment (OLTE) for double circuit 132 KV transmission line from Damak to Kabeli, comprising of 6 SDH, 7 PDH equipments with 22 Teleprotection Systems.
Status :
Delivery completed. Awaiting site readiness.Top
DIGITAL FIBRE OPTIC TRANSMISSION SYSTEM WITH TELEPROTECTION SYSTEM BETWEEM CHAMELIYA AND ATARIYA
Customer :
Nepal Hydro & Electric Ltd.Enduser: Nepal Electricity Authority
Scope:
The scope of the project included design engineering, integration, acceptance testing, installation and commissioning of the entire transmission system and associated equipments which includes an SDH STM-1 backbone, dedicated 8 Mbit/s PDH optical fiber based telecommunication system and LCT based NMS deployed to cover distance of 131 Km between Chameliya and Atariya.
Status :
Delivery Completed. Site Implementation under progress.Top
SURVEILLANCE SYSTEM FOR TAPOVAN-VISHNUGAD HYDRO ELECTRIC POWER PROJECT
Customer :
Bharat Heavy Electricals Ltd. Enduser: National Thermal Power Corporation Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of CCTV system that will provide monitoring facility in designated areas of Power House and Barrage stations using analog PTZ cameras with few other components like Video Matrix switcher, Digital Video Recorder, CCTV monitors and keyboard with joystick.
Status :
Delivery Completed. Site Implementation under progress.Top
TELECOMMUNICATION AND SURVEILLANCE SYSTEMS FOR SUBANSIRI HYDROELECTRIC PROJECT
Customer :
Alstom Projects India Ltd.Enduser: National Hydroelectric Power Corporation Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, training, installation, testing and commissioning of PAGA system, EPABX system, Conference System and Public Announcement System. Other systems to be deployed are CCTV system, PIDS, ACS system and power supply systems.
Status :
Delivery Completed. Site Implementation under progress.Top
COMMUNICATION EQUIPMENT PACKAGE FOR EASTERN REGION
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of various elements of digital telecommunication system which includes PDH and SDH equipments, EDFA, Radio system, power supply system and accessories.
Status :
Completed 2016Top
FOTE FOR CONNECTIVITY BETWEEN 400KV BPRS TO DVC, MAITHAN VIA 400KV PGCIL SUBSTATION AT RAMCHANDRAPUR
Customer :
Tata Steel Ltd.
Scope:
Turnkey scope for supply, installation, testing and commissioning of end-to-end connectivity for Data and Voice link between 400 KV BPRS and DVC, Maithon via PGCIL, Ramchandrapur. The communication package which includes 2Mbit/s PDH Digital Microwave Equipment, 2 Mbit/s Primary Order Dynamic Branching Multiplexer (DB2B), Voice and Data Interface Units, equipment cabinets, intermediate distribution frame will ensure smooth transmission of critical data and voice traffic between the main and sub-stations.
Status :
Completed 2015Top
FOTE FOR CONNECTIVITY BETWEEN 400KV BPRS TO DVC, MAITHAN VIA 400KV PGCIL SUBSTATION AT RAMCHANDRAPUR
Customer :
Tata Steel Ltd.
Scope:
Turnkey scope for supply, installation, testing and commissioning of end-to-end connectivity for Data and Voice link between 400 KV BPRS and DVC, Maithon via PGCIL, Ramchandrapur. The communication package which includes 2Mbit/s PDH Digital Microwave Equipment, 2 Mbit/s Primary Order Dynamic Branching Multiplexer (DB2B), Voice and Data Interface Units, equipment cabinets, intermediate distribution frame will ensure smooth transmission of critical data and voice traffic between the main and sub-stations.
Status :
Completed 2015Top
TELECOM SYSTEM FOR POWER DISTRIBUTION NETWORK FOR 6MTPA INTEGRATED STEEL PLANT AT KALINGANAGAR
Customer :
Siemens Ltd.Enduser: Tata Steel Ltd.
Scope:
The scope of the project includes design, detailed engineering, turnkey supply, testing and commissioning of SDH STM-1 equipment, 2 Mbit/s Primary Drop Insert Multiplexer, PDH Optical Line Terminal Equipment, Voice and Data Interface Units, SDH Network Management System, PDH Network Management System, Teleprotection equipment, Industrial Grade Ethernet switch and its Network Management System.
Status :
Completed 2015Top
UPGRADATION OF DIGITAL TRANSMISSION SYSTEMSPROJECT ACROSS 17 STATIONS
Customer :
Tamil Nadu Electricity Board
Scope:
Turnkey scope of the project involves system design engineering, integration, acceptance testing, installation and commissioning of OFC based SDH communication system to meet key telecommunication requirement. For centralized management of SDH STM-1/4/16 OLTE multiplexer equipment, element management system would be provided at central location at Madurai 400 KV SS and at Chennai MLDC.
Status :
Completed 2015Top
SUPPLY, INSTALLATION, COMMISSIONING OF DIGITAL COMMUNICATION SYSTEM FOR KOLDAM HYDRO ELECTRIC PROJECT
Customer :
Bharat Heavy Electricals Ltd. Enduser: National Thermal Power Corporation Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, training, installation, testing and commissioning of various telecommunication systems like SDH STM-1, Drop/insert multiplexer, SDH and PDH NMS, EPABX and power supply systems.
Status :
Completed 2015Top
COMMUNICATION EQUIPMENT PACKAGE FOR NORTHERN REGION
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Installation, Testing and Commissioning of various elements of digital telecommunication system which includes PDH and SDH equipments, EDFA, Radio System, Power supply system and accessories.
Status :
Completed 2015Top
DIGITAL FIBER OPTIC TRANSMISSION SYSTEM FOR BUTWAL-KOHALPUR LINK
Customer :
Nepal Hydro & Electric Ltd.Enduser: Nepal Electricity Authority
Scope:
The scope of the project includes system design engineering, integration, acceptance testing, installation, testing and commissioning of a dedicated 8 Mbit/s PDH optical fiber based telecommunication system to provide voice and data communication facilities between Butwal-Kohalpur substations.
Status :
Completed 2015Top
2x600MW COAL BASED THERMAL POWER PLANT PROJECT
Customer :
Jindal India Thermal Power Ltd.
Scope:
Turnkey scope of the project includes installation, testing and commissioning of Digital Microwave Radio, PDH multiplexer, Local Craft Terminal, power supply system and telephone equipments and their integration with existing communication system for providing critical Data and Voice services.
Status :
Completed 2014Top
DIGITAL PROTECTION COUPLER INTERFACE PROJECT
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey implementation of Nokia Equipments for Digital Protection Coupler interface under substation package- S8 for Agra, Kanpur, Bassi and Ballabgarh sub-stations. The various elements of the transmission system design offered were Nokia make Add/Drop Multiplexers, Dynacards- Data IF Unit 64K co/cont G.703, 10ch, FXO/FXS and 4W E&M cards.
Status :
Completed 2014Top
COMMUNICATION EQUIPMENT PACKAGE AND DTPC FOR SPECIAL PROTECTION SCHEME (SPS) PROJECT
Customer :
Adani Power Ltd.
Scope:
For centralized monitoring and management of new STM-1 transmission system and DTPC, the various elements of the transmission system design offered by Commtel includes following systems and sub-systems: SDH STM-1 equipment, SDH NMS, PDH Multiplexer with associated cards, PDH Multiplexer with associated cards, Tele-Protection Signaling Equipment, TPS NMS, Contact Multiplying Relay and configuration of existing equipments of URLDC network.
Status :
Completed 2014Top
EQUIPMENT PACKAGE FOR DATA AND VOICE COMMUNICATION OF CHURK
Customer :
Jaypee GroupEnduser: Uttar Pradesh Power Transmission Corporation Ltd.
Scope:
The various elements of the transmission system design offered by Commtel, utilizing existing ULDC network of UPPTCL communication system, included the following systems and sub-systems: SDH STM-1 Equipment (Fibrehome IBAS180), PDH Multiplexer with associated cards (Fibrehome SAU-02A), equipment cabinets (Rittal) and configuration of existing equipments of URLDC network.
Status :
Completed 2014Top
TELECOMMUNICATION NETWORK FOR 132 KV GIS STATION AT MNIT (JAIPUR) PROJECT
Customer :
Crompton Greaves Ltd. Enduser: Rajasthan Vidyut Prasaran Nigam Ltd.
Scope:
Scope of project includes turnkey implementation of a fibre optic link through the following systems- Nokia Siemens Network's SDH STM-1 hiT7025 and PDH, Teleprotection Unit (TPS64), EPABX system, GPS Clock and test instruments.
Status :
Completed 2014Top
SUPPLY, INSTALLATION AND COMMISSIONING OF NSN TPS AND CHANNEL CARDS PROJECT
Customer :
Uttar Pradesh Power Transmission Corporation Ltd.
Scope:
The project scope involves design engineering, supply, installation, testing and commissioning of carrier inter-tripping protection using Nokia Siemens Network Teleprotection Unit TPS64 Equipment, Dynanet cards- Data IF Unit 64K co/cont G.703, 10ch for 220 KV Sahupuri-400 KV Sarnath and 400 KV Azamgarh-400 KV Sarnath Line, using UPPTCL's exiting FO system.
Status :
Completed 2013Top
DIGITAL COMMUNICATION EQUIPMENTS PROJECT
Customer :
Gati Infrastructure Ltd.Enduser: Power Grid Corporation of India Ltd.
Scope:
Deploy a digital telecommunication solution between Gangtok and Binaguri in North-East India. The proposed communication system on OFC comprised of NSN Multiplexers to be installed at Gangtok and Binaguri S/s respectively along with an E1 link on leased-line also between these two stations. The communication will then further be extended from Binaguri via existing PGCIL WIDEBAND Communication network up to ERLDC Kolkata. The patching of new system was done with the existing ULDC system so that the data and voice connectivity can be established from Chuzachen plant to ERLDC Kolkata.
Status :
Completed 2013Top
TELECOMMUNICATION SYSTEMS PROJECT FOR VOICE AND DATA CONNECTIVITY
Customer :
Adhunik Power and Resources Ltd.
Scope:
Turnkey scope of project entails supply, installation, testing and commissioning of fibre optic cable termination, channel routing from PGCIL to Eastern Region Load Dispatch Centre (ERLDC). Supply of two multiplexers- Primary DM2 and Add/Drop DB2 are also covered under the project scope.
Status :
Completed 2013Top
SUPPLY, INSTALLATION, COMMISSIONING OF MULTIPLEXERS & DIGITAL TELEPROTECTION EQUIPMENT
Customer :
Telecommunications Consultants India Ltd.
Scope:
Project scope for design engineering supply, integration and acceptance testing of Nokia Siemens Networks PDH equipment, voice and data interface unit for data and voice transmission throughout the network and digital teleprotection equipment will be provided at all the 22 locations except Ankampally and GKLS-1.
Status :
Completed: 2012Top
SUPPLY, INSTALLATION, COMMISSIONING OF NOKIA MULTIPLEXERS FOR POWER GRID PROJECT
Customer :
ACB India Ltd.
Scope:
The project entails upgradation of communication system through Nokia Multiplexers and the proposed solution involved system design engineering, integration, supply, installation and commissioning of Nokia Multiplexers along with related equipments at Power Grid WRLDC Mumbai and ACBIL's 2x135 MWTPP - Kasaipali, Korba.
Status :
Completed: 2011Top
TURNKEY IMPLEMENTATION OF NOKIA MULTIPLEXERS FOR MUNDRA SUPER THERMAL POWER PLANT
Customer :
Coastal Gujarat Power Limited (A TATA POWER COMPANY)
Scope:
The scope of the project involved supply, erection, installation and commissioning of Nokia Multiplexers along with related equipments at Power Grid WRLDC and Mundra STPP (super thermal power plant).
Status :
Completed: 2011Top
UPGRADATION OF NETWORK MANAGEMENT SYSTEM FOR WBC NETWORK
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Installation, Testing and Commissioning of Nokia Siemens Network's NetViewer management system and associated equipment for PGCIL's Wide Band Communication network.
Status :
Completed: 2011Top
TELECOMMUNICATION SYSTEMS PROJECT FOR BALIA SECTION
Customer :
Power Grid Corporation of India Ltd.
Scope:
Project scope included supply, integration, installation and commissioning on turnkey basis of Nokia Multiplexers along with associated channel cards at Balia Section HVDC of Power Grid.
Status :
Completed: 2011Top
DIGITAL TELECOMMUNICATION SYSTEMS PROJECT
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope of project involves supply, installation, testing and commissioning of Nokia Multiplexers for voice and data connectivity from 400/220 KV DEHGAM substation to WRLDC Mumbai for 400/220 KV BACHHAU and 400/220 KV PIRANA Substation.
Status :
Completed: 2011Top
DIGITAL COMMUNICATION SYSTEM FOR NEW GRID PROJECT
Customer :
North Delhi Power Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, training, installation, testing and commissioning of Nokia Siemens Networks SDH system, software upgradation of existing Network Management System (TNMS) and power supply system.
Status :
Completed: 2011Top
SUPPLY, INSTALLATION, COMMISSIONING OF TELECOM AND SURVEILLANCE SYSTEMS AT PORT BLAIR
Customer :
National Hydroelectric Power Corporation Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, training, installation, testing and commissioning of PTZ IP CCTV system, NVMS system, EPABX system, Public Address System and Optical Media Converters.
Status :
Completed: 2011Top
DUSUPPLY, INSTALLATION, COMMISSIONING OF PRIMARY MULTIPLEXERS AT JAMMU AND WAGOORA STATIONS MMY
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of Nokia Siemens Networks make PDH OLTE, Primary and Secondary Order Multiplexers and Tele Protection equipment.
Status :
Completed: 2010Top
TURNKEY DEPLOYMENT OF DIGITAL FIBER OPTIC COMMUNICATION SYSTEM AT VIDYUT BHAVAN AND SALT LAKE-KOLKATA
Customer :
Power Grid Corporation of India Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of various elements of digital telecommunication system which includes PDH equipment, Primary order multiplexer, Voice and Data interface units.
Status :
Completed: 2009Top
SUPPLY, INSTALLATION, COMMISSIONING OF OLTE AND DIGITAL TELE PROTECTION EQUIPMENT
Customer :
Andhra Pradesh Power Generation Corporation Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of Nokia Siemens Networks make PDH OLTE, Primary and Secondary Order Multiplexers and Tele Protection equipment.
Status :
Completed: 2009Top
TURNKEY PROJECT FOR INTEGRATED COMMUNICATION NETWORK ON A FIBER OPTIC LINK BETWEEN NUNNA-SRISAILAM AND VTPS-IV STAGE
Customer :
Transmission Corporation of Andhra Pradesh (APTRANSCO
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Installation, Testing and Commissioning of PDH, Primary and Secondary Order Multiplexers, Voice and Data interface units, NMS, Tele Protection equipment, Fiber optic cable and patch panel, splice boxes.
Status :
Completed: 2009Top
FIBER OPTIC BASED GIGABIT TRANSMISSION AND TELE PROTECTION SYSTEM PROJECT
Customer :
Delhi Transco Ltd.
Scope:
Design engineering, Supply, Integration of Tele Protection Equipment along with OLTE System.
Status :
Completed: 2008Top
OLTE LAN EXTENSION PROJECT
Customer :
Transmission Corporation of Andhra Pradesh (APTRANSCO)
Scope:
Design engineering, installation, testing and commissioning of a SDH STM-1 system including Tejas STM-1 SDH Equipment, Nokia 8 Mbit/s OLTE and Nokia Primary Multiplexer Equipment for their application of LAN extension.
Status :
Completed: 2007Top
TURNKEY EXECUTION OF OLTE AND TELEPROTECTION EQUIPMENT PACKAGE FOR 228MW COMBINED CYCLE POWER PROJECT
Customer :
Alstom Projects India Ltd.Enduser: GVK Industries Ltd.
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, installation, testing and commissioning of Nokia Siemens Networks make PDH OLTE, Primary and Secondary Order Multiplexers and Tele Protection equipment.
Status :
Completed: 2005Top
TELEPROTECTION SYSTEM PROJECT
Customer :
Transmission Corporation of Andhra Pradesh
Scope:
Turnkey scope for system design engineering, integration of Teleprotection Equipment along with OLTE System.
Status :
Completed: 2005Top
SUPPLY, INSTALLATION, COMMISSIONING OF OLTE AND DIGITAL TELE PROTECTION EQUIPMENT
Customer :
Vemagiri Power Generation Ltd.
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Installation, Testing and Commissioning of Nokia Siemens Networks make PDH OLTE, Primary and Secondary Order Multiplexers and Tele Protection equipment.
Status :
Completed: 2005Top
SNOWY MOUNTAINS PROJECT
Customer :
CommTel, Australia. Enduser: Snowy Mountains Hydroelectric Authority
Scope:
Installation & Commissioning of 2 Mbit/s PDH equipment for heir existing Telecom Network.
Status :
Completed: 2000Top
NORTHERN REGION SYSTEM CO-ORDINATION AND CONTROL PROJECT.
Customer :
Nokia Corporation & Fortum Engineer Enduser: Powergrid Corporation.
Scope:
Maintenance Of the Digital Microwave Networksupplied installed and commissioned by Fortum Engineering Limited for a period of one year i.e. the Guaranteed Availability Period with an overall network availability of 99.9% in the year. A 24/7 engineering support network has been set-up by Commtel in 4 states in Northern India.
Status :
Completed: 2006Top
TELECOMMUNICATION SYSTEM IMPLEMENTATION SERVICES
Customer :
Marconi Telecommunications India Pvt. Ltd.Enduser: PGCIL
Scope:
Services for SDH STM-4 & SMT-1 and Primary Multiplex equipment deployment including installation, local commissioning, acceptance testing of the nodes in the OFC backbone network of PGCIL's Western Region SC&C Project. Commtel has deployed a total of 33 sites in the network. MSH41c, MSH11c and XMP-1 equipment of Marconi was deployed.
Status :
Completed: 2005Top
ANNUAL MAINTENANCE CONTRACT FOR COMMUNICATION NETWORK FOR DELHI REGION
Customer :
Tata Power Ltd.
Scope:
The project involves maintenance of SDH telecom network across 60 stations in Delhi Region.
Status :
OngoingTop
MAINTENANCE CONTRACT FOR WIDE BAND COMMUNICATION NETWORK IN NORTHERN REGION
Customer :
Power Grid Corporation of India Ltd.
Scope:
The project involves maintenance of wide band communication network under SC & CNR project at a GAP of 99.9%. The communication network consisting of Nokia Radios, Cross Connect and PDH Equipment along with Fujitsu SDH equipment has been under implementation for the past 9 years.
Status :
OngoingTop
ANNUAL MAINTENANCE CONTRACT OF WIDE BAND COMMUNICATION SYSTEM OF ULDC-EASTERN REGION PROJECT
Customer :
Power Grid Corporation of India Ltd.
Scope:
Maintain the Wide band Communication system which includes Fiber Optic equipments (SDH), Microwave Radio equipment, E-1 level Multiplexer and DACS and associated Network Management System (NMS) so as to ensure maximum availability of the equipments that include Antenna, RF cable, Aviation lighting systems, networking of NMS including cabling and repair of faulty cards.
Status :
OngoingTop
NORTHERN REGION CONTROL & CO-ORDINATION PROJECT
Customer :
Power Grid Corporation of India Ltd.
Scope:
Technical Support Services towards maintenance and upkeep of Nokia NMS/100 and NMS/10-MF Network Management System installed for NRCC Project of PGCIL. The NMS monitors more than 2000 network elements.
Status :
Completed: 2005Top
SUPPLY OF NOKIA EQUIPMENT SPARES
Customer :
Power Grid Corporation Of India Limited
Scope:
Supply of spares for spares for Nokia digital transmission system (Nokia Equipment)
Status :
Delivered in the month of March, 2005.Top
NORTHERN REGION CONTROL & CO-ORDINATION PROJECT OF PGCIL
Customer :
Competent Telecom Solutions Pvt. Ltd.Enduser: PGCIL
Scope:
Technical Support Services towards maintenance and upkeep of Nokia NMS/100 and NMS/10-MF Network Management System installed for NRCC Project of PGCIL. The NMS monitors more than 2000 network elements.
Status :
Completed: 2005Top
Commtel Foundation
Commtel Foundation As part of our social responsibility towards the community in which we live and flourish, we considered it imperative to take an initiative which provides us with a platform to support social causes...
Downloads
Download-button
Company Profile
Commtel Introduction

Technology Papers
Technical Glossaries and Abbreviations

Engineered Solutions
TechCare - 24x7 Tech Support
TechCare
Maintenance Service (Remote/On-Site, Voice/ Web Support) is being offered by the company under this segment.