TELECOM SYSTEM FOR CHENANI NASHRI TUNNEL IN JAMMU & KASHMIR
Customer :
IL&FS Transportation Networks Ltd.Enduser: National Highways Authority of India
Scope:
Turnkey scope for establishing critical communication insfrastructure consisting of design engineering, procurement, supply, installation & commissioning of Evacuative broadcast system, VHF, GSM and FM radio repeater system using leaky feeder cable and Antennas ensuring uninterrupted two way radio calls, GSM calls and FM Radio Station re-broadcasting with emergency Voice Break-In facility.
Status :
Under ImplementationTop
DABUNA PARADEEP IRON-ORE-SLURRY PIPELINE
Customer :
Essar Steel
Scope:
Turnkey scope for system design engineering, integration, acceptance testing, training, installation, testing and commissioning the entire telecommunication system, along the 260 km pipeline, with SDH system, PDH system, CCTV system, VSAT communication system along with power supply equipments.
Status :
Systems Delivered. Deployment in ProgressTop
TANTO JAJPUR IRON CONCENTRATE PIPELINE
Customer :
Brahmani River Pellets Ltd.
Scope:
Turnkey scope for system design engineering, integration of SDH STM 4, EPABX, NMS system, Video Conferencing System. Factory Acceptance Testing, training, installation and commissioning of the transmission equipment for 217 Km long Tanto-Jajpur Iron Concentrate Pipeline.
Status :
Systems Delivered Deployment in ProgressTop
HABSHAN FLARE GAS RECOVERY PROJECT
Customer :
Tyco International Ltd.
Scope:
Turnkey scope of this project applies to design and implementation of Structured Cabling System covering Interconnection with the existing structured cabling system and data network and Category 6 structured cabling was deployed.
Status :
Completed: 2012Top
CCTV SURVEILLANCE SYSTEMS PROJECT
Customer :
Ispat Steel Ltd.
Scope:
Scope of the project involves turnkey supply, installation & commissioning of CCTV surveillance system at BARGE.
Status :
Completed: 2011Top
SDH REPLACEMENT PROJECT FOR BAILADILA-VIZAG SLURRY PIPELINE
Customer :
Essar Steel
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Training, Installation, Testing and Commissioning towards replacement of existing SDH system.
Status :
Completed: 2011Top
SUPPLY, INSTALLATION, COMMISSIONING OF PRIMARY MULTIPLEXING & FIBER OPTIC EQUIPMENT FOR DGLL PROJECT
Customer :
Telecommunication Consultants India Ltd.
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Installation, Testing and Commissioning of Nokia Siemens Networks OLTE, PDH, NMS and Power supply systems for DGLL Kandla VTS Project in the Gulf of Kachchh.
Status :
Completed: 2010Top
SUPPLY, INSTALLATION, COMMISSIONING OF INDUSTRIAL GIGABIT ETHERNET FIBRE OPTIC COMMUNICATION SYSTEM
Customer :
Bhabha Atomic Research Center
Scope:
System design engineering, integration, Acceptance Testing, training, installation, testing and commissioning of various elements of Gigabit Ethernet FO Network made up of Microsens Gigabit Ethernet switches and Microsens NMS.
Status :
Completed: 2009Top
SUPPLY, INSTALLATION, COMMISSIONING OF CWDM BASED TELECOMMUNICATION SYSTEM
Customer :
Tata Institute of Fundamental Research
Scope:
Turnkey scope for system design engineering, integration, Acceptance Testing, Training, Installation, Testing and Commissioning of Transmode CWDM System comprising of Gigabit Ethernet Universal Aggregator, Multirate Transponder, CWDM Mux/Demux.
Status :
Completed: 2007Top
VIZAG-BALIADILA PIPELINE PROJECT
Customer :
Hygrade Pellets Ltd.
Scope:
Design, engineering, supply, integration, testing, installation, commissioning, & training of SDH STM-1 Digital Transmission System and Primary Multiplex Equipment for Iron Ore Slurry pipeline project.
Status :
Completed: 2006Top
ETHIOPIA TELECOM PROJECT
Customer :
Telecommunications Consultants India Ltd.Enduser: Ethiopia Telecom
Scope:
Supply of Nokia 34 Mbit/s (1+1) Protected OLTE system and associated Multiplexer equipment.
Status :
Completed: 2006Top
TATA TELESERVICES-SDH NETWORK IMPLEMENTATION
Customer :
Marconi Communications (India) Pvt. Ltd. Enduser: Tata Teleservices Ltd.
Scope:
Site survey, installation, testing, commissioning and system documentation of Marconi SDH equipment.
Status :
Completed: 2004Top
DWDM SYSTEM IMPLEMENTATION FOR BHARTI TELESONIC (NORTEL)
Customer :
Nortel Networks Enduser: Bharti Telesonic (India One)
Scope:
System documentation, supply of installation equipment, complete turnkey responsibility of DWDM implementation including installation, local testing, Acceptance Testing and commissioning of the network.
Status :
Completed: 2003Top
NEXTGEN NETWORKS PROJECTS, AUSTRALIA
Customer :
CommTel D.N.S., Australia. Enduser: NextGen Networks Pty. Ltd. Australia
Scope:
Verification & validation of DWDM based fibre optic transmission system upto capacity of 2.4 Tbit/s (Terabits) connecting five Primary nodes at Melbourne, Sydney, Brisbane, Adelaide & Perth.
Status :
Completed: 2003Top
TECHNICAL SUPPORT SERVICES FOR NOKIA SYNFONET & NSM/10 SYSTEMS
Customer :
Nokia India Pvt. Ltd.
Scope:
24x7 Technical Support Services to be provided on behalf of Nokia to its various GSM customers in India on Nokia Synfonet SDH Equipment and Nokia NMS/10 Network Management System.
Status :
Completed: 2008Top
IMPLEMENTATION SERVICES FOR NOKIA GSM BSC3i (Base Station Controller)
Customer :
Nokia India Pvt. Ltd.
Scope:
Services for Nokia DX200 High capacity Base Station Controller (BSC3i) equipment deployment including installation and commissioning of the same in GSM network. Commtel has deployed a total of 17 BSC's in the Haryana and the Himachal Pradesh Circles with 550 TRX and 660 TRX configurations for Bharat Sanchar Nigam Limited.
Status :
Completed: 2005Top
IMPLEMENTATION SERVICES FOR NOKIA DN2 CROSS CONNECT
Customer :
Nokia India Pvt. Ltd.
Scope:
Services for Nokia DN2 cross-connect equipment deployment including installation, commissioning and integration of the same in GSM network for Bharti and Hutch. A total of 60 DN2's have been deployed.
Status :
Completed: 2005Top
IMPLEMENTATION SERVICES FOR NOKIA METROHUB TRANSMISSION NODE
Customer :
Nokia India Pvt. Ltd.
Scope:
Services for Nokia MetroHub Transmission Node deployment including installation, commissioning and integration of the same in GSM network for Bharti. Commtel has deployed a total of 7 MetroHub's in the Mumbai region.
Status :
Completed: 2004Top
SDH SYSTEM IMPLEMENTATION SERVICES
Customer :
ECI Telecom India Enduser: Bharti
Scope:
Services for SDH STM-1 and STM-16 equipment deployment including installation, local commissioning and acceptance testing of the nodes in the OFC backbone network of Bharti on pan India basis. Commtel has deployed a total of 350 SDH nodes with different configurations. Micro SDM and XDM-100 equipment of ECI Telecom was deployed.
Status :
Completed: 2004Top
SDH SYSTEM IMPLEMENTATION SERVICES
Customer :
ECI Telecom India Enduser: Ceregon/Airtel
Scope:
Services for SDH STM-1 equipment deployment including installation, local commissioning and acceptance testing of the nodes in the GSM Microwave radio backbone network of Airtel in West and East of India. Commtel has deployed a total of 150 SDH nodes with different configurations. Micro SDM equipment of ECI Telecom was deployed.
Status :
Completed: 2004Top
SDH SYSTEM IMPLEMENTATION SERVICES
Customer :
ECI Telecom India. Enduser: Hutch, Andhra Pradesh
Scope:
Services for SDH STM-1 equipment deployment including installation, local commissioning and acceptance testing of the nodes in the Hutch network in Andhra Pradesh. Commtel has deployed a total of 21 SDH nodes with different configurations. XDM-100 equipment of ECI Telecom was deployed.
Status :
Completed: 2004Top
TRAINING ON NOKIA PRIMARY MULTIPLEX EQUIPMENT & NMS
Customer :
Nokia Networks Oy.Enduser: RAILTEL Corporation
Scope:
Training of 50 Man days provided to RAILTEL employee's on Nokia Primary Multiplex Equipment and Network Management System.
Status :
Completed: 2004Top
TRAINING ON NOKIA NMS
Customer :
Nokia India Pvt. Ltd.Enduser: Hutch, New Delhi
Scope:
Training of 10 Man days provided to Hutch employee's on Nokia Network Management System NMS/10.
Status :
Completed: 2004Top
HIGH CAPACITY DIGITAL CROSS CONNECT EQUIPMENT FOR VSNL
Customer :
Marconi Communications International Ltd. Enduser: Videsh Sanchar Nigam Ltd. (Cochin and Mumbai)
Scope:
Installation, testing and commissioning of Marconi MSH 84 DXC 4/1 equipment with capacity of 256 x STM-1 cross connection. Transfer and Integration of International traffic coming via SAFE(South Africa - Far East) and SEA-ME-WE-3 (South East Asia - Middle East - West Europe) submarine cables with National Traffic at VSNL Cochin and VSNL Mumbai.
Status :
Completed: 2002Top
GLOBAL SYSTEM FOR MOBILE COMMUNICATION
Customer :
Nokia Ltd. Enduser: Fascel Ltd., Ahemdabad Nokia Ltd. Enduser: Usha Martin, Kolkata Nokia Ltd. Enduser: BPL Mobile Communication Ltd., Mumbai
Scope:
Total BTS Site Integration for new sites & Microwave Radio Swap for existing site for mobile communication.
Status :
Completed: 2002Top
24x7 HELPDESK SUPPORT SERVICES
Customer :
ECI Telecom India
Scope:
24x7 helpdesk support services provided to ECI's Customers in India on their behalf which involves complain registration and forward to ECI technical team in India or Israel. 69 months of continuous and dedicated support services marked the completion of project.
Status :
Completed: 2010Top
Commtel Foundation
Commtel Foundation As part of our social responsibility towards the community in which we live and flourish, we considered it imperative to take an initiative which provides us with a platform to support social causes...
Downloads
Download-button
Company Profile
Commtel Introduction

Technology Papers
Technical Glossaries and Abbreviations

Engineered Solutions
TechCare - 24x7 Tech Support
TechCare
Maintenance Service (Remote/On-Site, Voice/ Web Support) is being offered by the company under this segment.